After the roof was fixed, the next big priority was to get all the moldy sheetrock out of the spare room. I was able to borrow a dehumidifier from a coworker to suck all the moisture out of the room. This with the super cold weather we have been having has been a challenge to keep the house warm! Everything is sealed up now.
While John was gutting this room, we had to move ALL of the clothes out of the closet so they wouldn't be covered by mud and sheetrock. In the mean time, those clothes lived in the living room. On the arm chair.
I am so excited to get back into this room and paint/decorate!
No comments:
Post a Comment